Model training on dedicated GPU clusters
Dedicated multi-node GPU clusters for training runs measured in weeks, with the storage and the operations behind them to see a run finish.
- Run length
- Weeks, not hours
- Topology
- Dedicated multi-node
- Storage
- 1 PB+ networked
- Memory
- ECC throughout
Training infrastructure is judged on whether runs complete
Peak throughput is the number every GPU vendor quotes. The number that decides a training programme is whether a run scoped at three weeks actually finishes in three weeks.
Runs fail for a small number of repeated reasons. A storage layer that cannot feed the GPUs fast enough. Memory errors on hardware without ECC. A component that degraded quietly until the job died and took the week with it.
Every one of those is an infrastructure decision taken before the run starts, so the cluster specification matters more here than on any other GPU workload.
How a training cluster gets provisioned
-
Workload shape
You tell us GPU count, expected run duration, model and dataset size, and how sensitive the job is to interconnect bandwidth.
-
Configuration
We come back with a node count, GPU model, topology and storage allocation, along with when it is available.
-
Reservation
The cluster is reserved for the term at a fixed configuration, so the topology your recipe was tuned against does not change under you.
-
Handover
Bare-metal access. Your scheduler, your containers, your model stack.
-
Operations
Telemetry runs for the life of the cluster, with on-site staff and remote hands behind it.
What a training cluster includes
- Topology
- Dedicated multi-node clusters
- Hardware
- NVIDIA B300 at first deployment, with H200 and H100 matched to the workload across multi-node clusters
- Memory
- ECC throughout
- Storage
- 1 PB+ networked storage tier
- Access
- Bare metal
- Best for
- Foundation and domain models
The hour-forty problem
A run that dies at hour forty has cost more than forty hours. It has cost the gap back to the last checkpoint, the re-queue, and the engineering time spent establishing whether the fault was in the code or the hardware. Continuous DCGM telemetry exists so a degrading GPU gets replaced in a planned window instead of being diagnosed after the fact.
Who reserves training capacity
- Teams training foundation models from scratch
- Groups adapting open-weight models on a domain corpus
- Research teams working to multi-week run horizons
- Teams that have hit reserved lead times on public cloud
- Organisations whose training data cannot sit on shared hardware
Why training capacity is reserved, not hourly
Hourly billing is attractive until the workload runs continuously. A cluster held for three weeks at an hourly rate costs more than the same hardware reserved for the term, and the hourly price buys an instance type that can be deprecated underneath a tuned recipe.
Reserved capacity also removes the queue. Teams routinely scope a run, get sign-off, and then find the reserved public-cloud capacity they costed against is three to six months out. The run slips a quarter for reasons that have nothing to do with the model.
The trade-off runs the other way too. Reserved capacity you are not using is wasted money, so burst and evaluation work usually belongs on a partition instead of a dedicated cluster.
Common questions
What GPU count can we reserve?
GPU clusters are sized to the run. We do not sell fixed blocks. Give us the GPU count you have scoped and the run duration, and we will confirm what is available against it.
Can we checkpoint to our own storage?
Yes. Clusters include 1 PB or more of networked storage, and you control the software stack, so checkpointing targets are your decision.
Which interconnect do the nodes use?
Topology is matched to the workload, sized for compute, memory bandwidth and interconnect together. Tell us how sensitive the run is to collective bandwidth and we will specify against it.
What happens to the cluster between runs?
It stays reserved to you for the term. Idle time is yours, which is the difference between reserved capacity and hourly billing.
Related capacity
Tell us the shape of the workload.
GPU count, run duration, and data-handling requirements. We reply within one business day with a configuration, compliance documentation, and availability. An NDA is available before any technical discussion. Enquiry details are not shared with third parties.


