NVIDIA GPUs for AI, from 16 GB to 141 GB

Six cards between sixteen and 141 gigabytes. The memory figure decides almost everything, so start with the table, then read the page for the card you land on before you commit to a quantity.

Cards
H200 NVL and five Blackwell
Memory range
16 GB to 141 GB
Supplied as
Cards, nodes or hosted
Reply time
One business day

Compare every card by memory

Availability is shown per card and is checked rather than assumed. Where it reads On request, tell us the quantity and we will confirm within one business day.

NVIDIA GPUs compared by memory, error correction, power, partitioning, what fits and availability
Card Memory ECC Power Partitioning What fits Availability
NVIDIA H200 NVL Hopper 141 GB141 GB HBM3e with ECC Yes Up to 600 W configurable Up to seven instances at 16.5 GB A 70B model at eight-bit on one card, or at FP16 across an NVLink pair; bridges pool up to 564 GB. On request
NVIDIA RTX PRO 6000 Blackwell 96 GB96 GB GDDR7 with ECC Yes 400 W to 600 W configurable Up to four instances at 24 GB A 70B model at eight-bit precision, or well past 100B once quantised. On request
NVIDIA RTX PRO 5000 Blackwell 48/72 GB48 GB or 72 GB GDDR7 with ECC Yes 300 W Not offered on this card A 70B model quantised at 48 GB, or the same model with real context headroom at 72 GB. On request
NVIDIA GeForce RTX 5090 Consumer 32 GB32 GB GDDR7, no ECC No 575 W Not supported A 30B-class model quantised, or a single-user development box. On request
NVIDIA RTX PRO 4000 Blackwell 24 GB24 GB GDDR7 with ECC Yes 145 W Not offered on this card A 13B model at eight-bit, or LoRA fine-tuning up to roughly the 20B class. On request
NVIDIA RTX PRO 2000 Blackwell 16 GB16 GB GDDR7 with ECC Yes 70 W Not offered on this card A 7B or 8B model at eight-bit, or a development box that does not need to be large. On request

Fit figures are engineering estimates: roughly 1 GB per billion parameters at eight-bit, 2 GB at full precision, plus context.

Start with the memory figure

Almost every specification on these cards varies by a sensible amount between models. Memory does not. It is the one figure that turns a workload from possible into impossible, and it is where the decision should begin.

A model has to fit in the memory of a single card to run well on it. Spreading one model across several cards works, and sometimes it is the only option, but it costs throughput on every request and adds a failure mode you did not previously have. Where a larger card removes that need entirely, it is usually the cheaper purchase even when the sticker price says otherwise.

Work out the size of the model you intend to run, add the context length you actually need, and buy the smallest card that holds both with room to spare. The page for each card sets out what fits.

If you are not sure which one you need

Tell us the workload rather than the card. Most of the specification sheets published for these GPUs compare numbers that will not change your outcome, and the one that will is rarely the headline. We have written the decision out in plain terms on a page of its own, and you can also simply describe the job and let us do it.

Three ways to buy the same hardware

The card is the same in all three. What changes is how much of the work around it you take on.

  • GPU card seated on a server board

    Bare cards

    The cards themselves, supplied for systems you already run. You handle the chassis, power, cooling and software.

    Who it suits
    Teams with existing infrastructure and the people to run it.

    Ask about cards →

  • Built GPU server node in a rack

    Built nodes

    Cards assembled into a chassis, burned in under sustained load, and delivered ready to rack with the logs from the burn-in.

    Who it suits
    Teams with rack space and power but without a build function.

    Ask about nodes →

  • Rows of hosted GPU racks in a data centre cage

    Hosted capacity

    The same hardware racked and run in our facilities, with the deployment scheduled to your window.

    Who it suits
    Teams who want the capacity without the building it sits in.

    Ask about hosted capacity →

What comes with every order

Condition
Factory new and sealed
Source
Factory allocation
Warranty
Manufacturer warranty
Order approval
KYC check before despatch
Minimum order
One card, or one eight-GPU node
Pricing
Quoted per order, against the quantity and the configuration

Common questions

Which NVIDIA GPU should I buy for AI?

Work out the memory your model needs, including the context length you intend to serve, and buy the smallest card that holds it with room to spare. If you tell us the workload we will do that arithmetic with you rather than sell you the largest card on the page.

Can I mix different cards in one deployment?

Across separate machines, yes, and it is often sensible to match the card to the job. Within a single node running one model across all the cards, no. The effective capacity falls to the smallest card in the group.

Why is there no price on these pages?

Pricing moves with allocation and quantity, and a figure published today would be wrong within the month. Tell us what you need and we will quote it properly rather than publish a number we would have to qualify.

How long does an order take?

Every order passes a KYC check before anything ships, and the timings run from that approval rather than from the order. Lead times are confirmed per card and per quantity when we quote.

Do you supply GPUs outside this range?

These six are what we hold allocation against. If you need something outside the range it is worth asking, because we would rather point you somewhere useful than sell you the nearest thing we happen to stock.

Can you host the servers rather than ship them?

Yes. We rack and operate them in our US facilities, on hardware you own or as reserved compute. The tenancy models are the same ones described on our single-tenant and multi-tenant pages.

Do you sell in bulk or to resellers?

Yes. Quantity pricing is available for integrators, neoclouds and enterprise buyers. Minimum order is one card, or one eight-GPU node.

What warranty applies?

Manufacturer warranty on the cards. Nodes we build also carry our burn-in validation, with the logs supplied.

What approval is needed before an order ships?

Every order and end customer passes a KYC check before anything ships. We start it as soon as you confirm the quote, and ship times run from that approval.

Where to go next

Tell us the shape of the workload.

GPU count, run duration, and data-handling requirements. We reply within one business day with a configuration, compliance documentation, and availability. An NDA is available before any technical discussion. Enquiry details are not shared with third parties.

Response
Within one business day
NDA
Available before technical discussion
Location
US & Europe-based facilities